Buildings for social development
Let's build it togetherIn the world of social development, construction needs constantly emerge to help those who need it the most
Gaptek works with governments, institutions and NGOs to turn dreams into reality when waiting is not a possibility, providing buildings for social development.
Our buildings for social development
Hospitals
Warehouses
Shelters
Housing
Markets

Short assembly time
Predesigned solutions for a quick on-site assembly

Turnkey solutions
From the design and production to the construction and maintenance of the buildings

Predefined quality
All constructive elements comply with CE marking and undertake quality controls

Energy efficiency
Passive systems are incorporated for major energy savings

Low maintenance
Minimum maintenance due to the aluminum structure, even when in aggressive environments

Scalability
Expandable solutions thanks to the use of the modular architecture principle
Contact the Gaptek team
FAQs
What makes Gaptek solutions different in the social development sector?
Gaptek designs and builds modular constructions that are high-quality, rapidly implemented and very adaptable.
Ultimately, we provide buildings that are prepared to be rapidly assembled in remote areas and difficult terrains around the world.
What is Gaptek’s expertise in the social sector?
The most relevant project that Gaptek has developed for social development purposes is the supply of 30 modular hospitals per trimester to offer high quality medical assistance across Africa and Central America.
The hospitals are used by an international NGO.
What is Gaptek’s scope? Can you build everywhere in the world?
Gaptek can design and build constructive solutions everywhere in the world and adapt to any kind of regulation and the most extreme weather conditions. Nowadays we are present in more than 20 countries and 5 continents, including the Antarctica.
What regulations do Gaptek buildings comply with?
Gaptek can adapt its solutions to any regulation. Our standards are generally based on the IBC, Eurocodes and CTE.
Contact form
Last posts
Gaptek delivers two performance modules to the Generalitat de Catalunya
The Performance modules were designed to respond to the current emergency of operation of the center in the minimum possible time. The Project was an emergency proposal determined by the DGAIA’s for th need to open an Immediate Care Center (CAI) for first care,...
Reaching Antarctica with our modular warehouse
This modular warehouse was built in the unique Antarctica. We are expanding our international presence by supplying our products around the world. The prefabricated modular warehouse has been constructed in the Spanish Base of Gabriel de Castilla and carried out by...
Modular hospital built with Gaptek structures in South Sudan
The international NGO Médecins Sans Frontières (MSF) built a modular hospital in South Sudan using Gaptek's system.Gaptek worked with MSF to deeply understand their needs and requirements for a modular hospital. This allowed us to provide them with a solution that...