Logistic centers

An agile construction for an agile business

Gaptek is leader in the construction of logistic centers that use modular technology and are adaptable to the most demanding needs of the sector

You can now experience the speed and the agility of an activity as dynamic as logistics also in the construction of your logistic center, thanks to the Gaptek System. Quality, time and adaptation are key.

Our logistic centers

Our logistic centers are a fast and integrated solution that incorporates all intralogistics elements and installations that your activity requires. The buildings are made of a Gaptek Flat structure, composed of gantries and purlins.

The external envelope is made of exterior corrugated steel sheet and interior rock wool sandwich panel, which provides a greater insulation and comfort.

Characteristics

Specifications

Dimensions: Unlimited

Assembly time: Depending on dimensions

Construction system: Gaptek Flat

Required cementation: Yes

Structure:

  • Structure assembly: Mechanical joints
  • Material: High resistance alloy aluminum AW-6082-T6
  • Warranty: 20 years

Standard Resistances:

  • Wind Standard: 104 km/h
  • Fire Standard: REI30
  • Snow Standard: 0.75 KN/sqm
  • Climate conditions: -20 ºC to 55ºC
  • Earthquake Standard: 0.1 g

Envelope:

  • Exterior: Corrugated metal sheet, high-resistance tensile canvas or insulating panel
  • Interior: Rock wool sandwich panel

Certifications:

  • ISO 9001
  • UNE-EN ISO 14001 in Environmental Management
  • UNE-ISO/IEC 27001 in Information Security Management
  • CE Marking in all materials, including EN-1090 in relation to steel and aluminum structures

 

Options

Available areas:

  • Storage area
  • Picking area
  • Reception beaches
  • Loading and / or loading docks
  • Manipulation area
  • Control area of orders
  • Refrigerated camera
  • Quarantine area
  • Returns area
  • Offices

Plus Resistances:

  • Hurricane Kit: up to 250 km/h
  • Fire Plus: up to REI120
  • Snow Plus: up to 3 KN/sqm

Additional elements:

  • Fire protection systems
  • Geothermal energy systems
  • Vehicle and personnel doors
  • Controlled atmosphere
  • High efficiency air cooling system
  • Racks

Additional services:

  • Maintenance
  • Life warranty with Gaptek maintenance
  • Logistics 

Applicable standards:

  • International Building Codes
  • Eurocodes
  • Spanish Technical Building Codes (CTE)
  • UFC 

 

Gaptek is a synonym of trust

Short assembly time

Predesigned solutions for a quick on-site assembly

Turnkey solutions

From the design and production to the construction and maintenance of the buildings

Predefined quality

All constructive elements comply with CE marking and undertake quality controls

Energy efficiency

Passive systems are incorporated for major energy savings

Low maintenance

Minimum maintenance thanks to the aluminum structure, even in aggressive environments

Scalability

Expandible solutions thanks to the use of the modular architecture principle

Contact the Gaptek team

FAQs

What structural materials are used by Gaptek?

Gaptek has developed a construction system based on prefabricated profiles and dry joints, using aluminum as the structural material for the advantages it has as opposed to traditional construction and its great adaptability.

The advantages of aluminum as structural material as opposed to steel are numerous, such as the optimization and customization of the profiles according to its specific use, as compared with steel’s standard and normalized profiles, the lightness of the profiles and its resistance, the low maintenance thanks to the anticorrosive properties of aluminum and its total recyclability.

What type of machinery is required for the assembly of the logistic centers?

Thanks to the lightness of aluminum profiles, the structural materials optimization and the simple assembly of our system using dry joints, it is not required to use very heavy machinery or large cranes to assemble our logistic centers. Only ordinary machinery such as lifting platforms and telescopic cranes.

Can I purchase a fully equipped logistic center?

Yes. Gaptek offers turnkey solutions, as well as FCA. We can offer from the structure and envelope with a fully equipped building with all the required intralogistics elements.

Can I incorporate loading/unloading doors to the logistic center?

Yes. Gaptek buildings are prepared to accommodate that a logistic center needs: loading doors, bridge cranes, protections, racks…

Can offices be added to a logistic center?

Yes. The Gaptek System allows the integration of Gaptek offices inside or attached to other buildings, including the logistic center, being both buildings totally compatible.

What is Gaptek’s logistic centers fire resistance?

The structures of the logistic centers are protected against fire using inner lining of rock wool sandwich panels. Therefore, the degree of fire resistance will depend on the thickness of the panel and its own fire resistance, adapting the project to the specific regulation and the requirements of the logistic center, without limits.

What is the durability of Gaptek logistic centers?

The materials used in Gaptek logistic centers, as well as in the rest of Gaptek products, have a great resistance and durability, similar to traditional construction systems. Gaptek offers a 20 year guarantee according to the structure and 5 years to the rest of the elements that compose the logistic center.

I want my logistic center to be energy efficient. Is it possible?

Yes. In fact, all Gaptek solutions minimize in a passive way the intervention of machines to reach comfort and energy efficiency. In addition, our system is totally compatible with the installation of renewable energies such as solar panels and geothermal.

Are Gaptek logistic centers resistant to extreme weather conditions?

Gaptek buildings are designed to withstand the conditions of the places inhabited by 85% of the world’s population, but they can also be designed for the most extreme climates of the planet. An example is the Gaptek warehouse that was built in the Antarctica.

Contact form

I would like to send this message to...

Consent

15 + 7 =

Last posts

Coal storage complex in Astafiev Terminal will be designed by Gaptek

On Tuesday June 18th Gaptek signed the contract for the design, supply and assistance in the construction of a high-tech modular roof for the unloading of coal, which will be built in the Astafiev terminal in Najodka, Eastern Russia. The terminal Astafiev JSC, in...

Gaptek at SITL Paris 2019

Gaptek will exhibit at SITL in Paris from the 26th to the 28th of March. The Transport and Logistics Innovation Week is one of the main logistics exhibitions in Europe, gathering more than 500 exhibitor organizations and 30,000 visitors from a great variety of...

Modular logistic center for Turkish Cargo is into operation

The 32,000 sqm modular logistic center that Gaptek delivered to Turkish Airlines has carried out the first air cargo transportations from Istanbul New Airport. Turkish Airlines has carried out two first cargo transportations. The domestic operation flew from Istanbul...

Estamos utilizando cookies en nuestro sitio web

Por favor, confirme, si acepta nuestras cookies de seguimiento. También puede rechazar el seguimiento, por lo que puede seguir visitando nuestro sitio web sin que se envíen datos a servicios de terceros.